Location Wayne, NJ
Architect Gensler
Construction type Precast Tilt up Wall / Steel Truss
Size 25,000 SF
Donnelly Construction proudly delivered a 25,000 sq. ft. state-of-the-art facility designed for maximum efficiency and storage. Highlights include a 15,000 sq. ft. cold storage area for temperature-sensitive goods and a 13,000 sq. ft. insulated slab that boosts thermal performance and energy savings.
The project features New Jersey’s first Eco Pure Detention System, a cutting-edge solution for sustainable water management that reinforces our commitment to eco-conscious construction. This facility reflects Donnelly Construction’s dedication to innovation, sustainability, and building high-performance spaces that meet the evolving needs of our clients.